by dev_q67eau | Jun 1, 2020 | Projects
Prev 1of6 Next The third addition to O’Gorman Medical Complex is the 10,200 SF neurosurgery and pain management clinic. The first floor of this design-build facility includes two procedure rooms, two recovery areas, seven exam rooms, nurse station, radiology station,...
by dev_q67eau | Aug 4, 2020 | Projects
Prev 1of7 Next Blackline was selected as the Construction Manager at Risk for this 12,000 SF Ambulatory Vascular Surgery Center. Blackline facilitated the selective demolition of the existing clinic and removal of the existing MRI machines. One wing of the building...
by dev_q67eau | Aug 4, 2020 | Projects
Prev 1of7 Next Blackline was selected through a competitive bid process to be the Construction Manager at Risk for the selective demolition and renovation of this 11,000 SF facility for renal dialysis and ambulatory care. Blackline performed investigative assessments...
by dev_q67eau | Jun 1, 2020 | Projects
Prev 1of6 Next Design-build renovation of a 12,000 SF office facility. This project included the replacement of all interior finishes, exterior storefronts, and mechanical systems. The plumbing and electrical systems were also upgraded substantially. A new exterior...
by dev_q67eau | Aug 17, 2020 | Projects
Prev 1of5 Next Teaming with the owner’s interior designer, Blackline acted as the design-builder on this 11,500 SF corporate office renovation. The project occurred in two phases in order to keep the second-floor offices in use during the first-floor renovation, and...
Recent Comments